INFORMATION ABOUT TRAC VAN INDUSTRIAL CLUSTER – HA NAM

Date posted: 08/Jun/23

Trac Van Industrial Cluster was established by the People’s Committee of Ha Nam province in March 2022, and the detailed planning was approved in June. In August 2022, the project was approved for investment policy, and at the same time approved for investors by Indochina Industrial Construction Joint Stock Company. Trac Van industrial cluster begins construction in the first quarter of 2023 with a total investment capital of 722 billion VND.

Details:

• Name: Trac Van Industrial Cluster – Ha Nam
• Location: Duy Tien town, Ha Nam province
• Scale: 57 hectares
• Occupancy rate: 10%
• Operating time: 50 years (2022-2072)
• Investment attraction fields: Supporting industries, electronics, and mechanics; Treasury, Logictics; Construction materials manufacturing industry group; Agricultural, forestry and animal feed processing industry group; Other industry groups.

Trac Van industrial cluster is known to be located in a prime geographical location, specifically:

1. Regional connection:
• The North borders the residential area of Quan Pho village, Chuyen Ngoai commune
• The West borders the A4-13 canal and the residential area of Quan Pho village, Chuyen Ngoai commune
• The East borders National Highway 38B
• The South is adjacent to a 69 m wide planned road

2. Distance:
• 2.8 km from Pearl River
• 6km from Dong Van intersection between Cau Gie – Ninh Binh Expressway (National Highway 1) and National Highway 38
• 60km from Hanoi City Center (equivalent to 45 minutes traveling)
• 85km from Noi Bai Airport
• 5km from Dong Van station (on the North-South railway).
• 100km from Hai Phong Port

Infrastructure of the Industrial Cluster:

• Internal traffic system: The industrial cluster designs 3m wide internal roads connecting to each plot of land with standard road bed load, ensuring container trucks and large trucks operate normally. On industrial park roads, investors also pay attention to planting trees to create landscapes. The industrial park reserves 12% of its area for planting trees.
• Power supply: Capacity 110 The power source in the Industrial Park is taken from the 110/35KV transformer station 1.5km from the Industrial Park through the 35KV-25MVA distribution station built in the Industrial Park. The 110KV line is connected to the fence of each factory in the industrial park.
• Drainage system: built on the basis of closely following the nature of the existing natural basin and leveling design, all rainwater of the cluster will be collected by storm sewers along the road and drained to A4-13 drainage canal along the west side of the project. The entire industrial complex has 5 stormwater outlets.
• Wastewater treatment system: Wastewater flows into separate drainage ditches leading to existing canals, without affecting the project implementation area.
• Waste and exhaust treatment system: the project is planted with trees according to planning, increased cleaning, watering, reducing dust and emissions. Regularly check and clean the wastewater treatment station area, garbage collection area, etc. Factories and enterprises investing in industrial clusters ensure that the rate of planting trees, flowers, and lawns reaches at least 10% of the building area. machine.

Trac Van Industrial Park promises to be an area that attracts strong investment for industrial projects in Ha Nam province.

Related articles